GBM Machine

Mining machine manufacturing expert

boq for civil works to cement grindingunit

We provide a variety of milling equipments and production line. Welcome to consult and purchase.
E-mail: [email protected]

  • BOQ TENDER TEMPLATE

    2021 10 21 BOQ TENDER TEMPLATE A bill of quantities BOQ is a document used in tendering in the construction industry/supplies in which materials parts and labor and their costs are itemized It also ideally details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for

    Get Price
  • ANNEXURE B Bill of Quantities

    2020 12 13 CEMENT CONCRETE WORK i 281 Concrete with 4cm gauge approved stone ballast approved coarse sand and Cement in the proportion of 8 4 1 including supply of all materials labor and tools and plants etc required for proper completion for the work Cum 113.00 4680 528840.00 3 B REINFORCEMENT CEMENT CONCRETE i 283

    Get Price
  • BOQ for waterproofing work at Flat No 6 48 Baghira

    2021 8 5 BOQ for waterproofing work at Flat No 6 48 Baghira Apartment Sno Particulars Quantity Unit Rate Amount 1 2307.18sqft 2Water proofing on parapet wall 1ft height 260rft Total Cost Providing and laying integral cement based water proofing treatment

    Get Price
  • Bill of Quantities and Cost Estimates

    2017 5 4 7166P02/BoQ and Cost Estimates 9 5 Since the Project Sponsor is a cement manufacturer cost of at least one alternative supplier has been inquired from the list of potential suppliers Information such as distance of each factory from project site capacity of production and type of cement produced has been taken into account in the assessment.

    Get Price
  • BILL OF QUANTITY FOR THE CONSTRUCTION OF

    2013 2 20 plugging with cement mortar 1 2 1 cement 2 Coarse sand to match the existing floor With Chlorpyriphos Lindane E.C 20 with 1 concentration Brick work with bricks of class designation 100A in foundation and plinth in Extra for Brick work in superstructure above plinth level upto floor V cum Half brick masonry with brick of class

    Get Price
  • SUMMARY OF COST FOR CONSTRUCTION OF

    2016 7 10 per direction of Engineer in Charge M 25 grade reinforced cement concrete by using 410kg of cement per cum of concrete a All work up to Roof level 297.43 Cum 4 147.40 12 33 561.18 5.33 Centering and shuttering including strutting propping etc and removal of form for a Foundation footings bases of columns Pile Cap etc for mass

    Get Price
  • SUMMARY OF COST FOR CONSTRUCTION OF

    2016 7 10 per direction of Engineer in Charge M 25 grade reinforced cement concrete by using 410kg of cement per cum of concrete a All work up to Roof level 297.43 Cum 4 147.40 12 33 561.18 5.33 Centering and shuttering including strutting propping etc and removal of form for a Foundation footings bases of columns Pile Cap etc for mass

    Get Price
  • SAMPLE Quotation for Building Construction Based on

    SAMPLE Quotation for Building Construction Based on Item rates contract Sl No Excavation in hard soft soil for foundation and removing the excavated earth to a distance not exceeding 50 m and with a lift up to 1 5 m in hard soil Providing and laying granite jelly concrete using 40 mm down size jelly for foundation and well compacted

    Get Price
  • Bill OF Quantities Format

    2020 10 20 Preparation of an Estimate Our take off teams are specialise in preparing Bill of Quantities for Contractors Sub Contractors and also Self Builders Developers wishing to tender projects themselves.Bills are produced using SMM7 Standard Method of Measurement 7th Edition or CESMM3 Civil Engineering Standard Method of Measurement 3rd Edition however we can adjust styles to suit

    Get Price
  • Bill of Quantity Name of work Construction of Gayna

    2016 12 8 work in case tools and plants are not meeting the requirement and /or are in unsafe condition 28 1004.3 The mixing of concrete shall be done in a concrete mixer and shall be compacted using mechanical concrete vibrators The contractor shall be required to carryout tests on the materials like agregate sand etc that are to be used for the

    Get Price
  • Easy Way To Calculate Of Quantity Of Materials From BOQ

    2020 11 16 Use of TOOLS 3 Calculation of quantity of Materials In this tool you can separately calculate the Quantity of all construction materials i.e Cement Sand Aggregate reinforcement bricks etc from each Item Works i.e PCC RCC Single Brick Flat Soling Plaster Brickwork Morter etc Easy way to Calculate Material Quantity from BOQ Tutorial No 1

    Get Price
  • Download Bill of quantities BOQ

    2021 4 3 The Benefits of BOQ BOQ is utilized in each stage pre contract post contract of the project but requirement of BOQ varies according to diverse contract agreements project 1 It delivers the basic idea of the project by arranging the quantities to tenderers 2 It describes the scope of the work.

    Get Price
  • 14 Bill of Quantities BOQ

    2020 2 21 Bill of Quantities BoQ Page1 Sl No Description Unit Quantity Rate Amount 1 SUB HEAD A CIVIL WORK SUB HEAD I EARTH WORK Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.50 m in width as well as 10 Sq.m on plan including disposal of excavated earth lead upto 50 m and lift upto 1.50 m.

    Get Price
  • Revised BOQ PRICE FORMAT SUPPLY Part I

    2020 1 6 cement concrete of specified grade excluding the cost of centring and shutteringAll work upto plinth level 1 4 8 1 Cement 4 coarse sand 8 graded stone aggregate 40 mm nominal size Cum 10.12 20 Brick work with common burnt clay F.P.S non

    Get Price
  • Bill of Quantities

    2018 4 2 13.5 CONCRETE PUMPFOOTINGS/SLAB ItemDescription QuantityUnitsRateAmountLvlLd 0694 30sConcrete pump fixed price for first 30m3 small 2Off 750.00 1 500.00 jobs 27 1 Concrete pump is foronly Total 13.5 CONCRETE PUMPFOOTINGS/SLAB 1 500.00

    Get Price
  • BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW

    2018 4 7 CIVIL WORKS FOR 8MW POWER PLANT ITEM Description Unit Quantity approx Rate Rs Amt Rs A EARTH WORK A 1 a b c Earthwork in excavation in all types of soil/rock but excluding hard rock requiring blasting at all depths in foundations of structures pipe trenches tunnels sewer lines drains etc to

    Get Price
  • BOQ FOR CIVIL REPAIRING RENOVATION WORK OF

    2018 4 26 BOQ FOR CIVIL REPAIRING RENOVATION WORK OF SBI AT PORT BLAIR BRANCH BUILDING ANDAMAN NICOBAR FOR INFORMATION ONLY PRICE BID TO BE SUBMITTED ONLINE 11.1 1 4 8 1 Cement 4 coarse sand aggregate 40 mm nominal size SQM 30 12 Finishing walls with Acrylic Smooth exterior paint WEATHERCOAT of required shade 12.1

    Get Price
  • BILL OF QUANTITIES

    2012 7 13 cement mortar 1 4 1 cement 4 coarse sand including grouting the joints with white cement and matching pigments etc complete Sqm 415 Size of Tile 60x60cm 2.4 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteringAll work up to Floor five Level cum 9

    Get Price
  • BILL OF QUANTITIES FOR PROPOSED BUILDING CIVIL

    2015 11 30 CIVIL WORKS AT LITEN 33/11 KV SUBSTATION ITEM NO DESCRIPTION UNIT QTY UNIT RATE AMOUNT 1 Preliminaries A Allow for a temporary site office adequate to accomondate six persons notice board shelves and store for materials and tools storage ITEM 1 B Allow for clean water for the works ITEM 1

    Get Price
  • BILL OF QUANTITIES FOR PROPOSED BUILDING CIVIL

    2016 5 3 works 1 3 6 mix mass concrete surround at 600mm deep LM 20 4 2NO.TRANSFORMER PLINTH P Excavate pit foundations not exceeding 1.5 metres deep from reduced levels CM 65 Q Cart away from site surplus excavated materials CM 64 R Plain concrete 50mmm thick blinding 1 4 8 to footing SM 54 Vibrated Reinforced Concrete Class 25/20 mm Aggregate in S

    Get Price
  • SAMPLE Quotation for Building Construction Based on

    SAMPLE Quotation for Building Construction Based on Item rates contract Sl No Excavation in hard soft soil for foundation and removing the excavated earth to a distance not exceeding 50 m and with a lift up to 1 5 m in hard soil Providing and laying granite jelly concrete using 40 mm down size jelly for foundation and well compacted

    Get Price
  • UNICEF

    6 drawings and one BOQ as per scope of works above Nov 1 12 2021 Preparation of engineering drawings and BOQ for Water Kiosk RC 3 faucet tiled wall 4 drawings and one BOQ as per scope of works above Nov 1 12 2021 Preparation of engineering drawings and BOQ for Concrete handwashing facility 6 faucet 4 x3 x7 high

    Get Price
  • BOQ for Civil Works of GD Phase

    2021 3 9 BOQ for Civil Works of GD PhaseI at the Lawrence School Sanawar MASONRY WORK 4.0 Brick work with common burnt clay FPS Non modular bricks of class designation 75 in foundation and plinth in 4.1 Cement mortar 1 6 1 cement 6 coarse sand Cum 5 4.2 Brick work with common burnt clay FPS Non modular

    Get Price
  • BOQ for rehabilation works and construction

    Civil works Earth works according to I.G.T.S drawings and instructions of site engineer 11 The contractor must hand over a full set of documentation Catalogs with direction of use warranty cards to the employer latest at taking over BOQ for rehabilation works and construction administration part with toilets for AL Mahdi school in

    Get Price
  • SOW BOQ SPECIFICATIONS

    2018 8 22 grade concrete and 12mm and 10mm TMT bars with 5 c/c with necessary lintels Proper SOW BOQ SPECIFICATIONSCGR TENNIS COURT FENCING REPLACEMENT CIVIL WORKS Note Measurement are approximate Vendors to take necessary measurements during site inspection.

    Get Price
  • BOQ

    2018 2 12 2.00 CIVIL WORK 2.01 Brickwork in 230 mm thick wall extension as/design in cement mortar 1 4 1 cement and 4 stone dust 6.58 cum 2.02 Brickwork in 115 mm thick wall extension as/design in cement mortar 1 4 1 cement and 4 stone dust 24.00 sqm Cement Plaster ‐P/L internal 10 mm25 mm thick cement plaster on walls

    Get Price
  • BILL OF QUANTITIES civil and specialist s works for

    2015 4 9 active zone of 3m Once all reinforced concrete works are completed the next grid shall be excavated Digging is done by hand and by machine if possible including soil removal outside of the building and its returning and compacting upon completion of all works in this area The depth of excavation is on average 4.0 3.0 m Excavation shall be

    Get Price
  • Bill of Quantities

    2017 3 6 Bill of Quantity is a document which provides project specific requirement list with details of different project activities including their quantities specifications Unit of measurement A Representative cost of Project is also determined considering prevailing market rates for all activities A bifurcated quantity statement of different

    Get Price
  • Free Civil Engineering Files for Downloading

    Meyerhof bearing capacity calculator meyerhof method shallow foundation bearing capacity mayerhof method download civil engineering sheets View all files of Foundation Analysis and Design Load Calculation Beam Analysis EXCEL Spreadsheet shear force

    Get Price
  • Contract Rates Specifications for your Home

    2021 2 17 T r i c o n B u i l d e r s The Makers of India s Finest Designer Homes Page 1 Dated 17.02.2021 Dear Sir/Madam Thank you for downloading the details of our general home construction rates Specifications We would undertake to design and build any categories of homes at a very reasonable cost while

    Get Price
  • Bill of Quantities Spreadsheet

    The BoQ is presented to the tenderers to allow them for easily set up a price for executing the works With BoQ the tenderers can easily figure out construction costs for their tender The contractor submit their tenders against the bill of quantities assigning their price for a single item.

    Get Price
  • boq for civil works to cement grindingunit

    What is BOQ Example of Bill of Quantity for Construction Bill Of Quantities For Civil Works Download this exclusive excel sheet for preparing bill of quantities for civil works One can calculate brick masonry work concrete work plaster work tiles floor area etc sketchup3dconstruction boq for coal mining for civil works to cement grindingunit

    Get Price
  • Revised BOQ PRICE FORMAT SUPPLY Part I

    2020 1 6 cement concrete of specified grade excluding the cost of centring and shutteringAll work upto plinth level 1 4 8 1 Cement 4 coarse sand 8 graded stone aggregate 40 mm nominal size Cum 10.12 20 Brick work with common burnt clay F.P.S non

    Get Price
  • BOQ TENDER TEMPLATE

    2021 10 21 BOQ TENDER TEMPLATE A bill of quantities BOQ is a document used in tendering in the construction industry/supplies in which materials parts and labor and their costs are itemized It also ideally details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for

    Get Price
  • Bill Of Quantities BOQ

    1 Introduction In common practice the bill of quantities is referred to as the BOQ or BQ Bill of quantities may be defined as the document that is prepared in the construction industry with the purpose of specifying the various materials labors and resources along with their costs.

    Get Price
  • BILL OF QUANTITY

    2014 11 2 9 BRICK WORK Brick work with common burnt clay F.P.S non modular bricks of class designation 7.5 at all levels in all shapes and sizes in a 230 mm thick Cement mortar 1 6 1 cement 6 coarse sand CUM 5 b 115 mm thick cement mortar 1 4 1 cement 4 coarse sand including providing and placing in position 2 nos 6 mm dia MS bars at every fourth course of half brick masonry SQM 50

    Get Price
  • Civil Works For Installation Of Structure For Moun Tender

    2021 9 24 TMC Civil Works For Installation Of Structure For Mounting Of Solar Power Panels At Homi Bhabha Cancer Hospital And Research Cent Due Date 14 10 2021 Tender Value City work Location Chandigarh Tender Notice

    Get Price
  • Bill Of Quantities In Civil Engineering

    2021 7 10 A bill of quantities BOQ exemplifies a report to be used for tendering function in the construction business materials Inside a BOQ all the data for resources components and manual labor and their expenses are listed The cost consultant usually an amount evaluator creates the report BOQ and it comprises project connected

    Get Price
  • Preparing BOQ for residential Villa

    2018 1 21 The volume of concrete is equal height of column neck that equal Depth of Excavation 1.5m Distance to the bottom of ground slab 0.75m depth of footing 0.40m depth of blinding 0.10m thickness of tie beam connected to that column multiply by

    Get Price
  • Download Excel Sheet For Civil Work Quantities

    2021 6 3 Advantages of Excel Sheet for Civil Work Quantities You can calculate Brick Masonry Work 2 You can also calculate Concrete Work 3 Also calculate Plaster Work and Quantities like 4 By using this sheet we can also calculate no of the tiles floor area of tiles 5.

    Get Price
  • BILL OF QUANTITIES Proposed Construction of

    2018 9 12 Proposed Construction of Classrooms toilets and allied blocks at Dhempe College of Arts Science at MiramarCIVIL WORKS Bill of Quantities Item No Description Unit Qty Rate Amount E PLASTER WORK 16.0 Providing and applying 6mm cement plaster to ceiling 1 4 1 cement 4 fine sand Sqm 385.00

    Get Price